Tuesday, November 25, 2008

always more trailwork to do

Sunday Dec 7th we will be meeting out at Signal Hill to continue more re-routes and a few other projects if we have time. We will meet at 8am at the grateful shed which you can drive to by going to the main parking lot and heading down the road torwards where the old airplane field was. We will have all needed tools just bring water, snack and good shoes, clothes. I will probably be out there till 4 p.m. or longer if my back can take it.

Also, our first work day for the fourth phase of the Itusi Trail will be
December 13th. We have heard from riders who want to lay out more
technical trail so here is your chance. This Phase will be built under
a revised MOA which will allow us to build to IMBA blue standards with a
reduced corridor width of 3 feet. We will also be able to incorporate
more of the naturally occurring obstacles as well.

bOb has already machine cut approximately .75 mile of trail that we will
be looking to hand finish. No backbreaking bench work!

Details:
-9:00 AM Saturday 12/13
-Tools provided
-Bring water/snacks
-Wear sturdy boots and work gloves
-Bring your bike if you want to ride after working.
-Go left on Wildlife Rd. (last road before entering the park), take your
first right through a park gate (probably not more than 100 feet after
turning), follow the signs.
-Parking will be along the side of the fire road which is nice and smooth.

Any questions, give me a shout. See ya in the woods!

No comments: